Urban parks and green spaces face unique electrical infrastructure challenges: limited installation space, strict aesthetic requirements, and demands for minimal public disruption. Traditional substations often require bulky concrete foundations, months of construction, and visible cabling—compromising both functionality and visual harmony.
Qinghao prefabricated compact substations address these pain points head-on. As seen in the recent Park project, the substation’s streamlined design blends into natural surroundings with custom green cladding, occupying 60% less space than conventional units.
Space Constraints & Fast Deployment
Parks cannot sacrifice precious green areas for electrical infrastructure. Our substations arrive pre-assembled and tested, reducing installation time by 70%.
Safety and Reliability
Public spaces demand fail-safe power management. Integrated IP33-rated protection shields components from moisture, dust, and vandalism. Real-time monitoring via IoT sensors (e.g., temperature, load balance) alerts operators to anomalies before failures occur—critical for lighting and fountain systems
Energy Efficiency & Eco-Compliance
Parks prioritize sustainability. Our Dyn11-transformer substations cut energy losses by 15% versus traditional units, while smart load distribution optimizes consumption during peak events. Noise levels stay below 45 dB, ensuring wildlife and visitor comfort.
Future-Proof Flexibility
Modular compartments allow easy upgrades (e.g., adding EV chargers or solar inverters) without structural changes—ideal for evolving park needs.
Before: 8-week timeline for traditional setup; 30m² footprint; delayed by weather.
After: 3-day installation; 12m² footprint; zero service interruptions during deployment.
Ready to Modernize Your Park’s Power Infrastructure?
→ Explore Our Solutions: https://www.cneeg.com/substation-en/133.html
→ Request a Custom Design: https://www.cneeg.com/contact-en/
Pre:Why Gas Deflation is Critical for Power Transformer?
Next: No more